About Us

The Midway Sewer District (fka Des Moines Sewer District) was initiated by a petition prepared and signed by residents of an area of approximately 200 acres in downtown Des Moines, and heard before the Board of County Commissioners. On July 16, 1946, at a special election, the sewer district was formed and the Commissioners elected.

The Board of Commissioners retained an engineering consultant to prepare a Comprehensive Scheme to provide a guide for the District. The Comprehensive Scheme was presented to the voters in 1949 and defeated. The Board did not meet again for over seven years. During this time the area continued to grow and the need for sewers became more urgent. The District existed in name only until the ninth meeting of the Board of Commissioners held on November 23, 1956. At this meeting the Board adopted an amended Comprehensive Scheme of Sewers. The Board declared an emergency and called for a special election on November 6, 1956, regarding authorization to issue general obligation and revenue bonds.

The special election propositions passed and by April 24, 1957, the first ULID (Utility Local Improvement District) was established. The District set about the process of constructing a collection system, submarine outfall, primary treatment plant, and two pump stations. By December, 1958, the District had an operating system of sewers.

Once the new sewerage system was in operation, numerous small extensions were installed to serve the rapidly developing area. By early 1960 there was interest from several surrounding developments, communities and precincts such as: Des Moines Terrace, Wesley Terrace, Zenith, Angle Lake, Thunderbird Estates, Bow Vista, Lake Olga & Rancho Vista, the Airport, Cascade, Columbus, Crest View, Ferdinand, Isabella, Limerick, Roosevelt, and Swept wing.

In January, 1961, a system of Additions and Betterments to the Comprehensive Plan was adopted by the District. Later this revised plan was put into effect by construction of sewers in ULID No. 2 to extend the Midway Trunk Sewer and to serve an area east of Des Moines known as Thunderbird Estates.

Top of Page

By August, 1960, the District began the process to build a new treatment plant even though the existing plant was only 1½ years old. The location of today’s present day Des Moines Creek Wastewater Treatment Plant was selected because it was better suited to serve the rapidly growing area. This treatment facility was completed in 1965, and was sized for an average dry weather flow of 1.91 MGD. The original treatment plant was converted into a pump station which is today the site of the 7th Avenue pump station.

In 1965, the Seattle-Tacoma International Airport abandoned their Bow Lake sewage treatment facility, which was inadequate for their future needs and began discharging sewage into the District’s system. The Airport also constructed an industrial waste treatment plant which discharges into the District’s outfall via an industrial trunk sewer that by-passes the sewage treatment plant.

Treatment Plant Office BuildingThere were numerous annexations in the period 1960 to 1980. The largest of these annexations was the merger of the Sylvia Pines Sewer District into the Midway Sewer District effective in June of 1968. The sanitary wastes from the sewered area of Sylvia Pines Sewer District were treated at a small treatment plant located on the east side of Salt Water State Park. In 1969, this treatment plant was abandoned and converted into the present day 16th Avenue Pump Station. The flows from this abandoned plant were conveyed to the Des Moines Creek Wastewater Treatment Plant.

As the District continued to grow the capacity at the Des Moines Creek Wastewater Treatment Plant was incrementally increased. The treatment facility was expanded from 1.9 MGD (Millions of Gallons per Day) to 6.0 MGD capacity. Upgrading the Des Moines Creek Wastewater Treatment Plant was complicated by certain geologic conditions at the plant location. Construction commenced with an extensive dewatering system to relieve the extreme artesian water pressure at the treatment plant site. Plant upgrade included construction of additional primary clarifiers, emergency generator, lab/office building, anaerobic digester, sludge pump room, chlorination building, chlorine contact chamber, and the addition of a 200 foot long multi-ported diffuser to the end of the existing outfall. This construction was completed in December, 1984.

Following the treatment capacity expansion the Des Moines Creek Wastewater Treatment Plant was upgraded to secondary treatment. Due to certain constraints at the plant site, the trickling filter / solids contact process was chosen. Two trickling filters, a filter pump station, an aeration basin, two secondary clarifiers, gravity thickener, belt press and building, and two carbon odor scrubbers were constructed. This construction was completed in July, 1989.

Immediately following start-up of the secondary treatment process an extensive odor control system at the treatment plant was constructed. This construction was completed in 1991.

Midway Sewer District OfficeA partial replacement of the Des Moines Creek Trunk was on-line in June of 1997. The bulk of the terrestrial portion of the replacement Des Moines Creek Wastewater Treatment Plant Outfall was completed in October, 1998. The portion of the outfall lying underneath Marine View Drive South was completed in January 2007 in cooperation with construction of the new bridge. The submarine portion of the outfall remains to be completed. It is anticipated that this construction will be accomplished in the fall of 2007.

Due to a continuing increase in demand, the treatment facility capacity was again increased. The chlorine disinfection system was replaced with ultra-violet disinfection, and additional emergency power generation equipment was added in December, 1999. Construction of a second anaerobic digester was completed June, 2000. The treatment facility now has a design capacity of 9 MGD.

All of the recommended improvements identified in the last Comprehensive Plan have been completed. Changes in land use policies and the Growth Management Act are continuing the trend of increased demand for sewerage facilities in Midway Sewer District service area.